The Future in Sight
-
2014
Opening of the new logistics center in Munich (17,300 m²) -
2015
New construction of a tank and truck wash with water recovery system -
2016
Conversion of the logistics center in Untersteinach -
2017
Our first show truck goes on tour -
2018
Hall reconstruction to aviation security standard, extension of loading ram, energy refurbishment -
2019
Retrofitting of hall 5 to a warm hall -
2020
Partial area in Untersteinach renovated for energy efficiency
Acquisition of photovoltaic systems at the Bayreuth location - Hall area covered with modules 5.000 square meters -
2021
Energy refurbishment at the Untersteinach location
Purchase of photovoltaic system at the Ismaning location
Installation of 4 charging stations with e-mobility at the Bayreuth location -
2023
New construction of two pent roof halls with 850 and 3170 square meters at the Untersteinach site. -
2024
E-mobility eActros 300
Switch from combustion engines to e-trucks for use in regional transport.
VIDEO