The Future in Sight

  • 2014

    Opening of the new logistics center in Munich (17,300 m²)
  • 2015

    New construction of a tank and truck wash with water recovery system
  • 2016

    Conversion of the logistics center in Untersteinach
  • 2017

    Our first show truck goes on tour
  • 2018

    Hall reconstruction to aviation security standard, extension of loading ram, energy refurbishment
  • 2019

    Retrofitting of hall 5 to a warm hall
  • 2020

    Partial area in Untersteinach renovated for energy efficiency
    Acquisition of photovoltaic systems at the Bayreuth location - Hall area covered with modules 5.000 square meters
  • 2021

    Energy refurbishment at the Untersteinach location
    Purchase of photovoltaic system at the Ismaning location
    Installation of 4 charging stations with e-mobility at the Bayreuth location
  • 2023

    New construction of two pent roof halls with 850 and 3170 square meters at the Untersteinach site.
  • 2024

    E-mobility eActros 300
    Switch from combustion engines to e-trucks for use in regional transport.

VIDEO

YouTube

Mit dem Laden des Videos akzeptieren Sie die Datenschutzerklärung von YouTube.
Mehr erfahren

Video laden